

Joining forces
Weighing 60 tonnes and a considerable 5.30 metres high and also wide, this dumper truck was transported to its new operating site in Rohrdorf in the Bavarian Pre-Alps. Moving construction machines of such dimensions is a matter of teamwork. In this case, BigMove, a pan-European network for special and heavy goods logistics, commissioned Scheuerle Fahrzeugfabrik with the construction of a special semi-trailer boasting seven BPW axles: the 7-axle EuroCompact low bed. The freight with a total height of six metres and a weight of 102.5 tonnes was transported by the Wallek haulage company.
Photo: Big Move AG